PROJECT  THE BECK GROUP
LOCATION DALLAS, TEXAS
RECORD SET 1912–2026 · ISSUE AUGUST 2026

Drawn
& Built

114
YEARS
110
IDENTIFIED
11
OFFICES
5
CHIEF EXECUTIVES

One hundred and fourteen years. Four names. One continuous firm.
The same company draws the building and then builds it.

A contractor issues a record set at the end of a job. An architect issues one at the start.
This firm does both — so this set carries the whole span, and marks where it thins out.

SCROLL TO READ THE SET
G-001 · General Notes

How to read this set

Before the drawings, the legend. Every figure here carries the class of evidence behind it, and every gap says so plainly. Three rules do most of the work on this particular firm.

RECORD
Primary source — the firm's own record, a government filing, a court docket, a certifying body, or a counterparty's release.
APPROVED AS NOTED
Strong industry or business press — ENR, business journals, established trade publications.
CORROBORATED
Professional corroboration — conference material, association records, partner and vendor case studies.
FOR REFERENCE ONLY
Aggregator — useful for finding things, never sufficient on its own.
V.I.F.
Inference — a conclusion drawn from other facts. Always marked as one.
V.I.F. Verify in field

A drafting note for something the drawings cannot settle. Here it marks a value that is not established. It is never filled with a guess and never rounded to zero.

RFI

Where two sources disagree, the set logs the disagreement instead of picking a winner. Seventeen are open. They have their own sheet.

Exclusion

A positive statement of what is not in the number. There is a separate company called Beck Technology and it is not this firm — the single most common error in published material about Beck.

Delivery is stated, never inferred

Being an integrated firm does not make any given project integrated. Where no source names both a design and a construction role, the model is recorded as not established.

Rank is not revenue

ENR figures are survey positions and survey dollars. They never share an axis with each other and never become a revenue trend.

Names carry their era

Work built as Central Contracting, Henry C. Beck Company or HCB Contractors is labelled that way and never folded silently into the modern name.

Where we don't know,
the set says so.

A-100 · Four Names, One Firm

1912 · Central Contracting Company

In 1912 a contracting company was founded in Houston by a man with two partners, whom he bought out the following year. The company has never stopped trading and has changed its name three times. Everything in this set is attributed to the name in force at the time.

1912
1946
1981
1999
Central Contracting Company1912–1946

Founded in Houston by Henry C. Beck Sr. with two partners. He bought them out the following year and kept the name.

Henry C. Beck Company1946–1981

Renamed under a sole proprietor. Beck Sr. led the firm until his death in 1961, at 61.

HCB Contractors1981–1999

The skyscraper years. Fountain Place, Cityplace, the Crescent — all built under this name, and this set never relabels them.

The Beck Group1999–PRESENT

Adopted at the Urban Architecture merger, which put architecture and construction inside one firm.

Half the record was built by a company
that no longer carries this name.

The spine, 1912–2026
1912
Central Contracting Company, Houston
Founded by Henry C. Beck Sr. with two partners.
1923
Shreveport — Slattery Building, Shrine Hospital
The first healthcare project the firm claims.
1924
Headquarters moves to Dallas
Tied to the Cotton Exchange Building. A secondary account says 1934 — RFI-002.
1930
Cotton Bowl, Dallas
1939
Atlanta office opens
The first office outside Texas — and still open, 87 years later.
1946
Renamed Henry C. Beck Company
1949
Henry C. Beck Jr. assumes leadership
The corporate record also has Beck Sr. leading until his death in 1961 — RFI-020.
1961
Launch Complex 34, Cape Canaveral
Florida work begins thirty-one years before a Florida office.
1964
NorthPark Center, Dallas
1975
Texas Scottish Rite for Children
The relationship that is still running in 2026.
1976
Beck Arabia formed; Larry Wilson becomes president
Sold to Juffali in 1982.
1981
Renamed HCB Contractors
1992
Peter Beck becomes the fourth chief executive
Mexico and Tampa offices open the same year.
1996
An internal technology group is founded
It becomes Beck Technology — a separate company today.
1998
Denver office opens
1999
Urban Architecture merges in — The Beck Group
The single event that defines the firm: one company, both disciplines, one profit-and-loss statement. A secondary account dates the rename 1998 — RFI-003.
2002
Fort Worth office opens
2003
Nasher Sculpture Center, Dallas
2012
The firm turns 100
2013
Fred Perpall becomes the fifth chief executive
The second non-family holder of the role, and its current one.
2016
Monterrey opens; Carolinas market entry
2021
South Florida office established
2023
Pamlico Capital invests in Beck Technology
The AEC firm is now a customer of the software company it started.
2024
Riviera Maya office announced
2026
Raleigh office announced; Dalí expansion begins
Eleven offices at this issue date.
The relationships behind the entries

Eight lines in this census are not single buildings. They are relationships — some of them running for half a century, most of them with no dates attached to the work inside. The firm says more than 90% of its business is repeat clients averaging more than ten projects each. This is what that claim looks like when you try to count it.

Texas Scottish Rite for Children1975 – active25+
University of Tampa1996 – 202419
Texas Healthdates not established6
The University of Texas at Austindates not established5
Tampa International Airportdates not established5
Texas Christian University2015 – active3
Broward Healthdates not established3
NorthPark Center1964 – phases undatedV.I.F.
A-200 · The Census

110 identified

BY YEAR, STACKED BY SECTOR

Everything before 1980 survives as landmarks only. The record thickens sharply after 2000, when the firm began publishing project pages — which says more about the archive than about the work.

SCHEMATIC · NOT TO SCALE · SQUARES ARE THE 11 CURRENT OFFICESDFWAUSTXOSHVTPASFLCCBATLGJCLAXDURMTYCMXKOR192019401960198020002020DATE NOT ESTABLISHEDSCOTTISH RITEUNIVERSITY OF TAMPADALÍTCUTAMPA INTERNATIONALUT AUSTINTEXAS HEALTHBROWARDSIMONIntegrated2825% OF THE RECORDConstruction3532% OF THE RECORDArchitecture76% OF THE RECORDNot established4036% OF THE RECORDNOT ESTABLISHED IS A VALUE. IT IS NEVER PROMOTED TO INTEGRATED.RiverSouth600 West 5thThe Domain — first phaseDomain PlazaDomain Tower 2500 West 2nd Street2010 East 6th StreetAltoTexas Bankers Association HeadquartersOmni Barton Creek Resort & Spa ExpansionDell Medical School Health Learning BuildingUT Austin Norman Hackerman BuildingUT Austin Welch Hall — 1929 East WingUT Austin Welch Hall — West WingUT Austin Gary L. Thomas Energy Engineering BuildingDell Jewish Community CenterJunior League of AustinLaguna Gloria — Marcus Sculpture ParkAustin Ridge Bible ChurchRonald McDonald House AustinThe Holdsworth CenterTivoli Regional Headquarters / IBMCrate & Barrel Gateway MarketThinkeryBeck Austin Office — Plaza SaltilloEVO Entertainment KyleTexas Scottish Rite for Children — programmeTexas Health Huguley HospitalTexas Health Huguley Critical Care TowerTexas Health Hospital MansfieldTexas Health Wellness and Recovery CenterJPS Parking GarageJPS Psychiatric Emergency CenterTCU East Campus Housing and DiningSMU Residential CommonsBaylor East VillageDickies ArenaOld Parkland WestBeck Corporate Headquarters — 1601 ElmThe Crescent / Crescent Court HotelFountain Place1700 Pacific TowerSunbelt Savings / Mary Kay BuildingJCPenney HeadquartersTexas Motor SpeedwayNasher Sculpture CenterKimbell Art Museum — Renzo Piano PavilionSundance SquareTCU Canty Street GarageUT Dallas EngineeringJPMorgan Chase FriscoMcKinney & OliveNorthPark CenterCotton BowlThanksgiving Square RenovationMiyako Hybrid Hotel PlanoDallas Wings Practice FacilityLaunch Complex 34Tampa International Airport — Airside CTampa International Airport — Airside F AdditionsTampa International Airport — ConRAC + People MoverTPA Airsides A/C/F — Restroom ImprovementsTPA Airside F — Roof Replacement220 West 7th — Beck Tampa BuildingUleleVictory LoftsLe Méridien TampaRivergate TowerEpicurean HotelUniversity of Tampa Technology BuildingUniversity of Tampa Grand CenterUSF Health College of Nursing ExpansionUSF Health CAMLSThe Dalí MuseumThe Dalí Museum ExpansionTampa Museum of Art Centennial ExpansionUSF St. Petersburg Student Housing and DiningWimauma High School UUUHarmony CoveBroward Health Graduate Medical Education RenovationNova Southeastern University Office BuildingBroward Health North Medical Office BuildingBroward Health Medical Office Building & GarageSlattery BuildingShrine Hospital for Crippled ChildrenAtlanta VA HospitalDisney HeadquartersBeverly Hills Hotel RenovationMLK Federal BuildingWayne N. Aspinall Federal BuildingHarim HeadquartersPeachtree Center RedevelopmentCityplace TowerReunion TowerComerica Bank TowerOne AT&T Plaza — Whitacre TowerTrammell Crow CenterPlaza of the AmericasCotton Exchange BuildingAT&T Discovery DistrictTec de Monterrey CCM — AulasTec de Monterrey CCM — BibliotecaTec de Monterrey — TecSaludVine StreetTexas Health Harris Methodist Alliance HospitalNasher Museum of Art at DukeThe James MuseumMoffitt Cancer CenterUSAA Southeast Regional OfficeUniversity of Tampa Residence Halls
HEALTHCAREHIGHER EDUCATIONCULTURALAVIATIONOFFICEHOSPITALITYCORPORATEGOVERNMENTACTIVESECOND CORPUSTAP ANY MARK FOR ITS SUBMITTAL
A-300 · The Loom

Who kept calling back

Read across, not down. Each thread is a client, and it thickens with every project. Four of them can be drawn because their dates are established. Five cannot — and rather than guess at their extent, this set puts them below the axis and says why.

198019902000201020202030Texas Scottish Rite for Children25+University of Tampa19The Dalí Museum2Texas Christian University3

Thread weight is project count. The dashed section on the Dalí thread is an expected 2028 opening — a planned date, drawn as one. Tap a thread for its record.

Five threads that cannot be drawn
EXTENT NOT ESTABLISHED

Twenty-one identified projects sit inside these five relationships and not one of them carries an established date. Drawing them anywhere on the axis above would be an invention.

M-800 · Means & Methods · Act II

How the work gets built

Most firms that say they do design-build are two companies in a contract. This one merged an architecture practice into itself in 1999 and has run both disciplines on one profit-and-loss statement ever since. That is a structural claim, and it is checkable.

One firm, one profit-and-loss statement
RECORD

The 1999 Urban Architecture merger put architecture and construction inside a single company rather than a joint venture. Dallas was the first office to co-locate the two disciplines; the regional office is still where they converge.

Cost feedback while the drawings are still moving
RECORD

Conceptual estimating, a historical cost database and target-value design applied during schematic work — the reason a firm that draws buildings also wanted to own the software that prices them.

An estimate that took days, produced in about a day
CORROBORATED

A firm-published 2024 preconstruction article describes an integrated estimating case at TCU. It is a company account, not an independent benchmark, and is recorded as one.

Delivery model is stated, never inferred
RECORD

A Beck project can be architecture-only, construction-only, integrated, or unestablished. Being an integrated firm does not make a project integrated. Thirty-four records in this census carry no stated model and none of them has been filled in.

More than 90% repeat clients, averaging more than ten projects each
CORROBORATED

A claim on the firm's own construction page. The denominator and the method behind it are not published, so it is stored as a firm claim rather than an audited measure.

Lean and IPD, evidenced on a named project
APPROVED AS NOTED

Target-value design, pull planning and a multiparty IPD contract with prefabrication are documented on Texas Health Harris Methodist Alliance — used as a teaching case in an industry SmartMarket report. Enterprise-wide adoption percentage is not published.

An annual Cost Report
RECORD

The firm publishes one, most recently the 2026 edition. It is market commentary from a preconstruction desk, which is an unusual thing for a contractor to maintain.

Two ladders, one office

The design side runs up through a chief design officer; the construction side runs up through a chief operating officer. They do not meet at the top. They meet in the regional office, where both disciplines sit — which is why the regional director, not the chief executive, is the structural hinge of this company.

DESIGN
1
Chief Design Officer
2
National Design Director
3
Managing Principal
4
Principal, Architecture
5
Design Director
6
Architecture Practice Leader
DELIVERY
1
Chief Operating Officer
2
Regional Director
3
Operations Manager
4
Director of Preconstruction
5
Regional General Superintendent
THE CONVERGENCE POINT

Seven regional directors — Dallas, Fort Worth, Austin, Denver, Atlanta, Florida and Mexico — each carry a single P&L covering both ladders. Dallas was the first office to co-locate them, and it is still the head office.

What the method sheet cannot tell you

The share of work actually delivered integrated is not published. Neither is the construction-only share, the architecture-only share, the self-perform percentage, the formal Lean deployment rate, the change-order rate, the RFI rate or any schedule-certainty measure. It is tempting to back-solve the delivery mix from the census on the previous sheet — but that census is a research sample, not the firm's order book, and doing so would produce a confident number with nothing behind it.

T-810 · Tech & the Exclusion · Act II

What we build with

This firm did not adopt construction technology. It built some, sold it, and now buys it back. That history is the most interesting thing on this sheet — and the easiest thing in the whole record to get wrong.

RevitAUTHORING
The model of record
RECORD
DynamoCOMPUTATION
Automation inside the authoring tool
RECORD
Rhino / GrasshopperCOMPUTATIONAL DESIGN
Geometry the design side drives
RECORD
NavisworksCOORDINATION
Clash detection and constructability
RECORD
BIM 360 / ACCCOMMON DATA
Where the model lives between disciplines
RECORD
Synchro4D
Sequence tied to the model
RECORD
cmBuilder4D + SITE LOGISTICS
Two-year agreement; site plan and sequencing
APPROVED AS NOTED
InventorFABRICATION
Model-driven fabrication support
RECORD
DESTINI Estimator / ProfilerESTIMATING
Licensed from Beck Technology under a three-year enterprise agreement
RECORD
Laser scanning · drones · GPR · RFIDREALITY CAPTURE
Existing conditions and verification
RECORD
Procore · BluebeamFIELD
Project management and markup
APPROVED AS NOTED
Enscape · LumionRENDERING
Design communication
CORROBORATED

This is a firm-stated stack from published material. It does not establish software versions, seat counts, or what percentage of projects actually run each tool. Note also that the firm's own technology page was last modified in 2022 and still promotes a product name that has since been superseded — read the staleness as a marketing-content signal, not a capability one.

EXCLUSION · WHAT IS NOT IN THIS RECORD
Beck Technology is
a different company.
RECORD

It shares a founder and a name-root with the construction firm, and nothing else that this record can establish. Every software executive named in press coverage — the chief executive, the president, the chief product officer — belongs to the software company, not to the firm profiled here. A widely circulated claim of a Beck Group chief technology officer is a conflation error. The two are held apart on every sheet in this set.

1996
An internal technology group starts inside Beck
1997
Rights to a UK design product, Reflex, are bought and rewritten
It becomes DESTINI, later DProfiler.
2006
Commercialised as an independent software company
2013
Estimator development begins with input from Sundt
A competing contractor helps shape the tool.
2015
DESTINI Estimator released
2017
The Beck Group licenses it — as a customer
Thirty Estimator and ten Profiler seats on a three-year enterprise agreement, after a year-long selection process. The firm chose its own former product on the open market.
2023
Pamlico Capital takes a strategic growth investment
Peter Beck and management retain ownership. Norbert Orth becomes chief executive of the software company.
2025
Workpack, an AI takeoff product, is acquired
By Beck Technology — not by the construction firm.
2026
DESTINI Cloud reaches general availability
Stated footprint: 87 of the ENR Top 400. Whether The Beck Group itself has migrated is not established.

The firm ran a year-long search and chose its own former product on the open market.

Thirty estimating seats and ten profiling seats on a three-year enterprise agreement. That is the single strongest piece of evidence that these are two separate businesses — and whether the licence is current in 2026 is not established.

The Virtual Building Group

A centralised national group with regional managers embedded in the offices — the mature pattern rather than a shared service bolted onto a project. The leaders are named. What sits beneath them is not.

HELD
Director of Virtual Design and Construction
Mason Blalack, Dallas. Rose from senior project engineer to national VDC manager to director. Leads the Virtual Building Group across coordination, modelling, design technology and reality capture.
HELD
Senior VDC Manager
Joe McAuliff. Named on UT Dallas Athenaeum, UT Dallas Performance Hall, Old Parkland East, Saint Michael & All Angels, TCU East Campus and ongoing ACC housing.
HELD
Regional VDC managers, embedded
Alejandro Iturriaga among them. A centralised national group with regional managers inside the offices — the mature pattern, not a shared service bolted on.
OPEN
VDC Manager requisition JR101326
Live in the company's own Workday feed under Austin, while the mirrored description still speaks to Tampa. Two requisitions, or one with unresolved geography — RFI-006.
V.I.F.
The full Virtual Building Group roster
The leaders are public. The headcount, the regional allocation and the reporting lines below them are not. This is a retrieval gap, not an absence.
V.I.F.
ISO 19650
Not found in any published Beck material. The firm does reference a BIM execution plan practice. This is a could-not-find, which renders differently from a measured absence and should never be reported as one.
WHERE THE ANALYTICS STOP

There is a senior preconstruction analytics manager who owns the historical cost and estimating data, and a requisition citing data modelling, Power BI and Python against the accounting system. That is cost analytics. No data scientist, machine-learning engineer, chief data officer or head of AI was found anywhere inside the construction firm — that work lives in the separate software company. The distinction matters, and collapsing it would overstate the firm in exactly the direction everyone expects.

G-700 · The House · Act II

Who owns it, who runs it

Third-generation, family-controlled, privately held, and — this needs saying plainly because the aggregators keep getting it wrong — not an ESOP. Five people have run it in a hundred and fourteen years, and two of them were not family.

Five chief executives, 1912–2026
Henry C. Beck Sr.1912–1961
Founder. Led until his death at 61.
Henry C. Beck Jr.1949–1976
Assumed leadership in 1949 — which overlaps his father's tenure. Both statements sit in the record — RFI-020.
Larry Wilson1976–1992
The first non-family chief executive. Oversaw the Crescent, Plaza of the Americas, Fountain Place and Cityplace. Died 2016.
Henry C. (Peter) Beck III1992–2012
The fourth. Started the technology group and merged in the architecture practice.
Fred Perpall2013–PRESENT
The fifth, and the second non-family holder of the seat. Named at 38.
EXCLUSION
Not employee-owned

No ESOP has been identified, and whether any employee ownership exists at all is not established. Aggregators routinely tag unrelated companies with "Beck" in the name as employee-owned; those are different firms. Several of this firm's closest competitors are ESOPs, which makes the difference worth stating rather than leaving to inference.

THE OTHER SEAT
Family chair, non-family chief executive

The founder's grandson is executive chairman; the chief executive is the second non-family holder of that role. Board composition beyond those two seats is not disclosed anywhere in the public record.

How many people work here
V.I.F.

Four numbers circulate and none of them is a payroll count. They differ by date, by geography and by what was being asked. They are shown separately because averaging them would produce a figure that no source supports.

1,000+firm-reported in its own impact and cost reportsa report-date figure
900+the current careers-page wordingU.S. and Mexico, phrasing not a count
867U.S.-based employees, Great Place To Work, Oct 2025a survey profile field
>1,000profiles associated with the company on a professional platformassociations, not payroll
What the workplace survey says
94%
SAY THIS IS A GREAT PLACE TO WORK
Pride in accomplishments95%
Proud to tell others they work here95%
Contributes to the community94%
Management is competent93%
#26 · FORTUNE BEST WORKPLACES IN TEXAS 2026 · SMALL AND MEDIUM

These are certified survey figures across 867 U.S. employees, taken October 2025 — a different instrument from an anonymous review site, with a different sample and a different set of incentives. Neither kind should be read as the other, and this set carries only the first.

The 2023 impact report, as reported
1,668,635
HOURS WORKED
2023
0.48
INCIDENT RATE
firm-reported
0
LOSS-TIME / DART
firm-reported
89.65%
WASTE DIVERTED
21,000+ tons
6.1M
GALLONS OF WATER SAVED
2023
15,262
mtCO₂e AVOIDED
2023
150+LEED-CERTIFIED PROJECTSfirm-claimed, 2024 material
V.I.F.USGBC BODY-VERIFIED COUNTthe certifying body's own tally is not established
2003USGBC MEMBER SINCEconfirmed on the organisation profile
99%OF REPORTED EMISSIONS ARE SCOPE 3associated with the buildings the firm designs

The firm signed the AIA 2030 commitment and reports that 99% of its emissions are scope 3 — the buildings it designs, not the offices it occupies. That is the honest framing for an architecture practice, and it also means the number is an estimate of designed performance rather than a measurement of operated performance.

Approvals
2019 · THE BECK GROUP
AGC Construction Safety Excellence — Silver, over 3 million work hours
2026 · THE BECK GROUP
#26, Fortune Best Workplaces in Texas — small and medium
2016 · THE BECK GROUP
ENR Top 100 Green Contractors — #38, up from #69
2015 · BECK ARCHITECTURE
BD+C Top Reconstruction Architecture Firms — #1
DATE V.I.F. · BECK ARCHITECTURE
AIA Dallas Architecture Firm of the Year
DATE V.I.F. · TEC DE MONTERREY CCM
AIA Dallas Built Design Awards — Aulas; Biblioteca (Honor); Vine Street (Merit)
DATE V.I.F. · THE BECK GROUP
LEED Proven Provider, BD+C — GBCI expedited review status
G-710 · The Signature Block · Act II

Who signs the work

Every drawing carries one — drawn by, checked by, approved by. It is where a person takes responsibility for the work. This is that block for the whole company, and its most striking feature is what is missing from it.

38
SIGNATURES ON THE BLOCK
9
ON THE DESIGN LADDER
17
ON THE DELIVERY LADDER
0
WITH A PUBLISHED JOIN YEAR
Not one join year is published

Thirty-eight leaders are named. Not one of them carries a published join year, and only two are publicly linked to specific buildings. That is a gap in what the firm publishes, not a judgement about the people. There is no tenure chart on this sheet for the same reason there is no delivery-mix pie on the last one: the underlying values do not exist in any source, and inventing them from job-title chronology would be the exact failure this set is built to avoid. Every seal below carries a dashed edge and a V.I.F. mark. This is a question for the firm, not a finding about the people.

38 seals · tap for the record
ENTERPRISEDESIGNDELIVERY & REGIONSTECHNOLOGY & VDC
ENTERPRISE
DESIGN
DELIVERY & REGIONS
TECHNOLOGY & VDC

One name here does not appear on the firm's own leadership page: the director of virtual design and construction. He runs the group that coordinates every model on every integrated project, and his seat is documented by a professional association rather than by his employer. That is a coverage signal about the page, not about the role.

S-400 · The Rank · Act III

National rank, 2018–2026

ENR ranks the Top 400 by construction revenue. Lower is better, so the axis is inverted — up is up. This is a position among competitors, not a measure of the business, and it never shares an axis with a dollar figure anywhere in this set.

2018 · rank 57The highest position in the identified series.
2024 · rank 136The lowest. Seventy-nine places over six years.
2026 · rank 133Broadly flat across the last three publications.

A second record inside this same research corpus gives materially different ranks for overlapping years — 2025 at 61 and 2026 at 74. Both cannot be right. The complete, internally consistent series is the one charted; the alternative is logged as RFI-001 and is not averaged in. A slipping rank is also not a revenue decline: it is a position relative to everyone else who filed a survey that year.

Four separate surveys · never combined
On both lists at once
APPROVED AS NOTED

The genuinely unusual finding: this firm appears on the contractor list and the design list in the same year. Very few do. These are four different surveys with four different scopes, and they are shown apart because that is what they are.

#298
TOP 500 DESIGN FIRMS
2026 · up from #364
#84
TOP 100 DESIGN-BUILD
2026 publication
#52
TEXAS & SOUTHEAST
contractor, 2026
#73
TEXAS & SOUTHEAST
design, 2026
$810.98MREGIONAL CONSTRUCTION
2025 · ENR survey metric · 83% general building · 15% telecommunications · 2% transportation
$73.60MREGIONAL DESIGN
2025 · ENR survey metric · 94% general building · 6% transportation
$297.8MDESIGN-BUILD CONTRACTS
2024 · per the ENR table · not total company revenue

These are survey figures published by ENR, not audited financial statements. Regional and national surveys have different scopes and are never combined into one series. The firm is private and publishes no revenue, no margin and no backlog — so none appears in this set.

E-830 · Conditions · Act III

Existing conditions

Existing conditions is the first drawing on any renovation. These are the conditions this record sits inside — not the market's, but the evidence's. A set that only shows what it knows is worth less than one that shows the shape of what it doesn't.

45%
OF RECORDS CARRY A YEAR
60 do not
36%
HAVE NO STATED DELIVERY MODEL
40 records
25%
ARE EVIDENCED AS INTEGRATED
28 records
V.I.F.
OF THE FIRM'S ACTUAL WORK MIX
not published anywhere
THE CONDITION, STATED PLAINLY
The denominator does not exist.

There is no published portfolio covering a hundred and fourteen years, and no archive that could be counted against. So this set makes no claim about what percentage of the firm's work it has found. It says 110 records were identified, names where they came from, and refuses to convert that into a completeness score. Any future percentage should be computed against a named universe — the current official portfolio, state accessibility filings, one city's permit record — and should say which.

Delivery model across the identified record
28
35
7
40
INTEGRATEDCONSTRUCTIONARCHITECTURENOT ESTABLISHED

SHARE OF 110 IDENTIFIED RECORDS · COUNT, NOT VALUE · NOT THE FIRM'S WORK MIX

Where the identified work concentrates
Higher Education22
Office20
Healthcare19
Cultural11
Mixed-Use10
Corporate10
Hospitality9

Healthcare, higher education and cultural work dominate — and all three reward a firm that can carry design and construction on the same contract, because all three involve owners who change their minds while the drawings are live. That is a coherent story. It is also the shape of a research sample, and the two should not be confused.

C-820 · The Field · Act III

Who else is bidding

Nine firms compete for the same work. Two of them are more interesting than rivals: one is a joint partner on an airport programme, and one helped specify the estimating software the sister company now sells to the industry.

Austin Commercial
PARTNER
DALLASENR TOP 25EMPLOYEE-OWNED

Joint partner on the Tampa International rental-car centre and people-mover programme, and a direct rival on Texas institutional work. Ranks materially higher on the Top 400.

Clayco
CHICAGO / ST. LOUISENR TOP 30PRIVATE

The closest structural analogue in the country: design and construction inside one company rather than a partnership. Whoever wins the integrated-delivery argument nationally, these two are making it.

McCarthy Building Companies
ST. LOUIS / DALLASENR TOP 15EMPLOYEE-OWNED

Healthcare, higher education and aviation — the three sectors where this census is deepest. Competes at greater scale in all three.

Haskell
JACKSONVILLEENR TOP 40EMPLOYEE-OWNED

Architecture, engineering and construction under one roof, with a Florida home market. The nearest thing to a mirror image in the southeast.

Sundt Construction
COLLABORATOR
TEMPEENR TOP 50EMPLOYEE-OWNED

Contributed requirements to DESTINI Estimator from 2013. A competitor helped specify the estimating product the sister company now sells to the industry.

DPR Construction
REDWOOD CITYENR TOP 10EMPLOYEE-OWNED

Healthcare and advanced technology, with a deep self-perform and VDC bench and a strong Lean record.

Rogers-O'Brien
DALLASREGIONALFAMILY, 3RD GENERATION

Another third-generation family firm chasing the same DFW institutional work, and investing visibly in reality capture.

Gray
LEXINGTONENR TOP 40FAMILY

Design-build across industrial and manufacturing — a different sector mix, the same delivery argument.

Balfour Beatty US
DALLAS / UK PARENT~$4.5B USPUBLIC

Public-company scale and balance sheet on work a private firm reaches differently.

BARS INDICATE SECTOR AND MARKET OVERLAP, 1–5 · SCALE FIGURES ARE THIRD-PARTY AND VARY WIDELY

Five of the nine are employee-owned. This firm is not — which is a real difference in the recruiting conversation, and one of the few structural facts that separates it from the peer set rather than from the general contractor down the road.

Where the work concentrates
SECTOR EMPHASIS
Healthcare5
Higher education5
Cultural and museum5
Aviation4
Corporate and office4
Hospitality4
Government3
Sports and entertainment3
Retail3
Housing2
Industrial1
HOW THE FIRM OPERATES
Integrated design and construction5
Preconstruction and conceptual estimating5
Repeat-client orientation5
Technology lineage5
Sustainability programme4
VDC organisation4
Geographic reach4
Scale against national majors3
Published project census2
Financial transparency1

These are analyst judgements on a 0–5 scale, derived from the evidence in this set rather than measured. They are shown because the shape is useful and marked because the numbers are not survey data.

Where this firm wins
  • Design and construction on one contract and one P&L, since 1999
  • Preconstruction and conceptual estimating — the discipline it built a software company around
  • Healthcare, higher education and cultural work where the owner keeps moving
  • Relationships measured in decades rather than projects
  • Presence on the contractor list and the design list in the same year
Where it does not
  • Raw scale against the national majors at rank 133
  • Employee ownership as a recruiting argument, against five peers who have it
  • Published project record — thinner than the work almost certainly is
  • Financial transparency, which is the price of staying private
  • Combined design and construction liability carried by one balance sheet
A-600 · Open Work · Act III

August 2026 · 10 open

Everything in this record that is not finished at the issue date — under construction, in preconstruction, or a relationship that has never closed. Expected dates are recorded as expected and are never promoted to events.

THE CLIENT WHO CAME BACK FOR THE OTHER HALF OF THE FIRM
The Dalí Museum Expansion
In 2011 this firm built the museum to somebody else's design. In 2028 it will open an expansion that the same firm designed and built — roughly 35,000 square feet, a $65 million investment by the museum, ground expected to break in autumn 2026. Seventeen years, one client, and a service line that changed in between. It is the single clearest illustration of what the 1999 merger was for.

Several 2025 and 2026 completions in this set were announced with expected dates and have not been independently confirmed as opened. They are held as expected, not actual — and that is a limit of this record, not a comment on the projects.

R-840 · Exposure · Act III

Open items and history

Being named in a construction dispute is a procedural fact, not a finding. For a firm of this age and size, an empty litigation record would be the surprising result — and what this set found is not an empty record so much as an unsearched one.

HCBeck, Ltd. v. Rice
CLOSED
Supreme Court of Texas2006–2009BECK AS PARTY

A workers-compensation matter turning on statutory-employer doctrine, argued before the state supreme court. Being a party to litigation is not evidence of wrongdoing or liability.

United States v. Said et al.
CLOSED
S.D. TexasCHARGED 2018BECK AS VICTIM

Nine people, led by a construction manager on a Le Méridien hotel project in downtown Houston, charged with wire fraud and money laundering to embezzle $3.4 million from The Beck Group. Beck was the victim, not a defendant. The lead defendant was sentenced to 60 months in 2019; a co-conspirator received 72 months and more than $3 million in restitution. This is a different building from Le Méridien Tampa in the census.

Complete docket census, all jurisdictions
NOT ESTABLISHED
TX · GA · CO · FL · NC

No exhaustive federal, state or county census was run. Legal coverage on this record is explicitly low. For a firm of this age and size a substantial civil docket would be unremarkable — and the absence of found cases is not the absence of cases.

Note the direction of travel on the fraud case: the firm was the victim of a $3.4 million embezzlement by one of its own construction managers, not a defendant. That distinction is easy to lose in a headline and impossible to lose in a docket, which is why party status and outcome are separate fields here and why neither is ever implied from the other.

Safety
2023Firm-reported safety metrics
RECORD

1,668,635 hours worked, an incident rate of 0.48, and a loss-time and DART rate of zero. These are the firm's own reported figures from its impact report, not an insurer's or a regulator's.

2019AGC Construction Safety Excellence — Silver
APPROVED AS NOTED

In the over-three-million-work-hours category, accepted by the firm's director of safety in Denver that April.

2018–2025OSHA partnership and alliance
RECORD

A partnership with the Fort Worth area office from 2018, and an alliance renewed 3 June 2025. OSHA states plainly that alliances are cooperative relationships and not endorsements — so this set does not present one as an approval.

2000Historical Tampa inspection 303851117
RECORD

Opened as a referral and partial inspection. Two serious violations and $13,500 initially; the current record shows one violation and $2,250. Twenty-six years old and not a proxy for present performance.

—Historical Tampa inspection 303605943
RECORD

Two serious violations and $9,000 initially; citations later deleted by informal settlement, and the current record shows zero violations and no penalty.

—Current EMR, TRIR and DART history
V.I.F.

Not published. Typically available only inside a prequalification packet. A complete OSHA establishment census was also not run.

RFI Log · Act IV · 17 open

Where the sources disagree

A request for information is what you file when the drawings disagree. These are the places where two credible sources say different things — including, twice, two records inside this same research corpus. None is resolved here. Resolving them by preference would be worse than leaving them open.

RFI-001OPEN
ENR Top 400 rank series
ASSERTION A
A complete series 2018–2026 running 57 · 72 · 92 · 96 · 115 · 119 · 136 · 131 · 133
ASSERTION B
A second internal record giving 2015 #86, 2016 #61, 2017 #74, 2025 #61 and 2026 #74
RESOLUTION RULE
These two series cannot both be right for the overlapping years. The complete, internally consistent 2018–2026 series is charted; the alternative figures are recorded here and not averaged into it. Resolve against ENR directly.
RFI-002OPEN
The year the headquarters moved to Dallas
ASSERTION A
The firm's own history: 1924
ASSERTION B
Secondary compilations: 1934
RESOLUTION RULE
The primary account carries the higher class and is preferred for display. Both are kept. Contemporary corporate or property records would settle it.
RFI-003OPEN
The year the firm became The Beck Group
ASSERTION A
An academic case study: 1998
ASSERTION B
The firm and secondary encyclopaedic sources: 1999
RESOLUTION RULE
The rename is coincident with the Urban Architecture merger, so a one-year spread probably separates agreement from completion. Record both.
RFI-004OPEN
Office count
ASSERTION A
Ten, per a secondary encyclopaedic source
ASSERTION B
Eleven, on the firm's current contact page
RESOLUTION RULE
The live contact page governs the current roster. Stale bios naming Houston, San Antonio, Charlotte or Cabo San Lucas are historical, not current.
RFI-005OPEN
How many people work here
ASSERTION A
Firm reports say more than 1,000; the careers page says more than 900
ASSERTION B
A workplace survey field says 867 U.S.-based; a professional platform associates more than 1,000 profiles
RESOLUTION RULE
Four different questions produce four different answers, and none of them is a payroll count. Shown separately. Averaging them would invent a figure no source supports.
RFI-006OPEN
VDC Manager requisition — where the job actually is
ASSERTION A
The company's own Workday feed tags JR101326 to Austin
ASSERTION B
The mirrored description speaks to Tampa-region impact, and an older Tampa requisition JR101133 also exists
RESOLUTION RULE
Current Workday metadata is the authority for the listing location. Whether this is one role with a stale description or two separate requisitions needs a recruiter to confirm. Both are held open.
RFI-007OPEN
LEED project count
ASSERTION A
The firm's 2024 material states experience with more than 150 LEED-certified projects; a separate internal record circulates 200+
ASSERTION B
The certifying body confirms membership since 2003 and Proven Provider status, but an independent project tally was not completed
RESOLUTION RULE
A firm claim and a body-verified count are different objects and are displayed as two numbers. Neither is collapsed into the other, and the internal disagreement between 150+ and 200+ is itself unresolved.
RFI-008OPEN
Nasher Sculpture Center — delivery model
ASSERTION A
The v1.0 census records the delivery model as not established
ASSERTION B
The master knowledge base records it as integrated, on counterparty evidence — Beck Architecture as co-architect of record with the design architect, HCBeck as general contractor
RESOLUTION RULE
The counterparty evidence is strong and the record here shows integrated, but the disagreement between two internal corpora is logged rather than quietly overwritten.
RFI-009OPEN
Reunion Tower — general contractor
ASSERTION A
One encyclopaedic source names The Beck Group
ASSERTION B
A construction database names HCB Contractors; a third account names a different contractor entirely, with a slipform subcontractor
RESOLUTION RULE
Unresolved on three assertions. All three are recorded. A 1978 building predates the modern name in any case, so even the first assertion needs era correction.
RFI-010OPEN
USF Health College of Nursing — size
ASSERTION A
The current project page: 100,000 SF
ASSERTION B
The 2025 topping-out release: 85,000 SF
RESOLUTION RULE
Recover the final permitted or GMP scope and establish whether the figures describe gross area or the addition alone.
RFI-011OPEN
Dickies Arena — project value
ASSERTION A
$450 million, referenced as the arena value
ASSERTION B
$540 million as the venue value at completion in 2019
RESOLUTION RULE
Two dated assertions about a moving number, not a contradiction to be split. Both are held with their dates. Neither is Beck's contract value.
RFI-012OPEN
Domain Tower 2 — floor area
ASSERTION A
755,000 SF in the project-page header
ASSERTION B
332,265 SF described as the Class AA office component
RESOLUTION RULE
Two different area semantics for the same building. Kept apart. Beck is the architect on this project and not the contractor, which is the more important thing not to get wrong.
RFI-013OPEN
500 West 2nd Street — floor area
ASSERTION A
494,688 rentable square feet in the header
ASSERTION B
Approximately 500,500 SF as a building figure in the body
RESOLUTION RULE
Rentable and gross are different units. Tag both; never reconcile by rounding.
RFI-014OPEN
Charlotte office — when it opened
ASSERTION A
The corporate timeline records a new Charlotte office in 2016
ASSERTION B
A 2019 announcement calls Charlotte the newest regional office while saying work began in 2016
RESOLUTION RULE
Market entry and physical occupancy are different events. Lease or occupancy records would separate them. Charlotte is now off the current roster and Raleigh is on it, and the transition date is not established either.
RFI-015OPEN
Beck Technology — the ownership link
ASSERTION A
Described as an independent software company and, elsewhere, in sister-company language
ASSERTION B
The 2023 investment announcement discloses that the founder and management retained ownership, but publishes no capitalisation table
RESOLUTION RULE
The only load-bearing public fact is that the construction firm licenses the software commercially. Everything beyond that requires a shareholder agreement. Until then, the two companies are held apart.
RFI-016OPEN
Henry C. Beck Company — which business
ASSERTION A
The 1946–1981 construction predecessor name
ASSERTION B
The same name also appears in the corporate history attached to financial, lending and investment activity
RESOLUTION RULE
Do not automatically treat these as the same entity. Corporate filings would resolve it.
RFI-020OPEN
Who was running the firm between 1949 and 1961
ASSERTION A
The corporate timeline: Henry C. Beck Jr. assumed leadership in 1949
ASSERTION B
A separate account has Beck Sr. leading the firm until his death in 1961
RESOLUTION RULE
Both can be true if operational and titular leadership diverged, but neither source says so. The overlap is drawn on the succession bars rather than smoothed away.

A record you can trust is one that logs its disagreements.

Z-900 · Closeout · Act IV
DRAWNBUILT · AUG 2026

One firm signs
both lines.

Coverage · what this set actually knows

Coverage is not one number, and for this firm it cannot honestly be one number. The last twenty-five years are reasonably strong. The first sixty exist as a handful of landmarks. A single blended score would hide exactly that.

1912–19398%
Five records. Milestone-only digital trace.
1940–196912%
Four records. The deepest archival gap in the set.
1970–198920%
More milestones, but the contracting party is often unrecorded.
1990–199930%
The HCB-to-Beck Group transition complicates every attribution.
2000–200950%
Web-era signature work becomes recoverable.
2010–201972%
Official project pages and releases are materially stronger.
2020–202685%
Current pages, releases and permits are strong — but not census-complete.
Current office rosterVERY HIGH
Corporate lineage and rankingsHIGH
Current executive leadershipHIGH
VDC leadershipMODERATE–HIGH
Austin and Florida project recordMODERATE–HIGH
Dallas–Fort Worth project recordMODERATE
Legal entity structureMODERATE
SafetyMODERATE
Workforce and alumniLOW
LitigationLOW
Financial statementsLOW
1912–1969 project recordSPARSE
110 projects identified — 92 in the census, 18 in a second corpus
No percentage of the firm's lifetime work is claimed, because no denominator exists to claim it against. This set does not know how much it is missing. It knows which questions would tell it.
Punch list · 12 open items, prioritised
P0
Get the delivery mix from the firm
The share of work delivered integrated, construction-only and architecture-only is the single most useful unknown here. It cannot be back-solved from this census, and this set does not try.
P0
Reconcile the two ENR rank series
Two internal records give incompatible ranks for the same publication years. One subscription pull settles it and repairs the most load-bearing chart in the set.
P0
Confirm the VDC requisition geography
One requisition tagged Austin, one description written for Tampa, and an older Tampa requisition behind both. A recruiter answers this in a phone call.
P0
Obtain the Beck Technology capitalisation table
The relationship between the two companies is the highest-risk merge in any account of this firm. Without the cap table, the honest position is that they are separate and commercially linked.
P0
Recover the full Virtual Building Group roster
Three leaders are public. The headcount, regional allocation and reporting lines are not, which makes it impossible to size a capability everyone agrees is real.
P1
Tally the certifying body's own LEED count
The firm claims more than 150 projects, and a second internal record says 200+. The body's directory can be counted directly, and until it is, both numbers stay on the page.
P1
Run the OSHA establishment census and pull current safety rates
Two historical Tampa inspections are all that surfaced. Current EMR, TRIR and DART are unpublished and normally live in a prequalification packet.
P1
Complete the litigation docket census
Texas, Georgia, Colorado, Florida and North Carolina. One matter and one fraud case in which the firm was the victim is not a census.
P1
Build the census against a named universe
A percentage of all Beck work since 1912 cannot be computed, because the denominator does not exist. Count instead against the official portfolio, state accessibility filings, or a city's permit record — and say which.
P2
Close the identifier gaps
Federal registration identifiers, the state architecture-board firm number, and the state taxpayer numbers for both operating entities. These were not retrieved, which is not the same as not existing.
P2
Confirm or refute ISO 19650 use
Not found in any published material. A could-not-find renders differently from a measured absence, and reporting it as the latter would be the exact error this set exists to avoid.
P2
Date the Charlotte-to-Raleigh transition
The roster changed without a closure event in any reviewed material. A lease or a registration would date it.
RECORD SET · DRAWN & BUILT · ISSUE AUGUST 2026
Compiled from BECK-KB v1.0 and the Beck GraphRAG master knowledge base · research cutoff 13 August 2026.
Every figure resolves to a source claim with an evidence class and an observation date.
Unknown values are marked V.I.F. and never estimated. Conflicting sources are logged as RFIs and never silently resolved.
The Beck Group and Beck Technology are separate companies and are held apart throughout.